Information

  • Author Services

Initiatives

You are accessing a machine-readable page. In order to be human-readable, please install an RSS reader.

All articles published by MDPI are made immediately available worldwide under an open access license. No special permission is required to reuse all or part of the article published by MDPI, including figures and tables. For articles published under an open access Creative Common CC BY license, any part of the article may be reused without permission provided that the original article is clearly cited. For more information, please refer to https://www.mdpi.com/openaccess .

Feature papers represent the most advanced research with significant potential for high impact in the field. A Feature Paper should be a substantial original Article that involves several techniques or approaches, provides an outlook for future research directions and describes possible research applications.

Feature papers are submitted upon individual invitation or recommendation by the scientific editors and must receive positive feedback from the reviewers.

Editor’s Choice articles are based on recommendations by the scientific editors of MDPI journals from around the world. Editors select a small number of articles recently published in the journal that they believe will be particularly interesting to readers, or important in the respective research area. The aim is to provide a snapshot of some of the most exciting work published in the various research areas of the journal.

Original Submission Date Received: .

  • Active Journals
  • Find a Journal
  • Proceedings Series
  • For Authors
  • For Reviewers
  • For Editors
  • For Librarians
  • For Publishers
  • For Societies
  • For Conference Organizers
  • Open Access Policy
  • Institutional Open Access Program
  • Special Issues Guidelines
  • Editorial Process
  • Research and Publication Ethics
  • Article Processing Charges
  • Testimonials
  • Preprints.org
  • SciProfiles
  • Encyclopedia

JOItmC-logo

Article Menu

  • Subscribe SciFeed
  • Recommended Articles
  • Google Scholar
  • on Google Scholar
  • Table of Contents

Find support for a specific problem in the support section of our website.

Please let us know what you think of our products and services.

Visit our dedicated information section to learn more about MDPI.

JSmol Viewer

The impact of electronic procurement adoption on green procurement towards sustainable supply chain performance-evidence from malaysian iso organizations.

e procurement research paper

1. Introduction

  • Assessing the level of sustainability after the adoption of E-procurement technology;
  • Assessing the factors portraying as a tool for green procurement practices;
  • Assessing the effect of E-procurement technology on green procurement practices for the sustainable supply chain.

2. Literature Review

2.1. e-procurement system in malaysia, 2.2. green procurement practices (gpp), 2.3. research hypothesis development, 2.3.1. green procurement practices influenced by electronic reverse auction, 2.3.2. green procurement practices influenced by electronic tendering, 2.3.3. green procurement practices influenced by electronic sourcing, 2.3.4. green procurement practices influenced by electronic ordering, 2.3.5. green procurement practices influenced by electronic informing, 3. research methodology, sample and data collection, 4. data analysis, 4.1. descriptive statistics, 4.2. partial least square–structural equation modeling (pls-sem) analysis, 4.3. path diagram analysis, 4.4. measurement model evaluation (outer model), 4.5. structural model evaluation (inner model), 4.5.1. coefficient of determination (r 2 ), 4.5.2. predictive relevance (q 2 ), 4.6. discussions, 4.7. managerial implications, conclusions, and limitations, managerial implications and its impact on society, economy, and nation, 5. conclusions, limitations, and future research directions, author contributions, institutional review board statement, informed consent statement, data availability statement, acknowledgments, conflicts of interest.

  • Toktaş-Palut, P.; Baylav, E.; Teoman, S.; Altunbey, M. The impact of barriers and benefits of e-procurement on its adoption decision: An empirical analysis. Int. J. Prod. Econ. 2014 , 158 , 77–90. [ Google Scholar ] [ CrossRef ]
  • Ramkumar, M. A modified ANP and fuzzy inference system based approach for risk assessment of in-house and third party e-procurement systems. Strat. Outsourcing Int. J. 2016 , 9 , 159–188. [ Google Scholar ] [ CrossRef ]
  • Almajali, D.A.; Masa’Deh, R.; Tarhini, A. Antecedents of ERP systems implementation success: A study on Jordanian healthcare sector. J. Enterp. Inf. Manag. 2016 , 29 , 549–565. [ Google Scholar ] [ CrossRef ]
  • Khan, S.A.; Liang, Y.; Shahzad, S. An Empirical Study of Perceived Factors Affecting Customer Satisfaction to Re-Purchase Intention in Online Stores in China. J. Serv. Sci. Manag. 2015 , 8 , 291–305. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Tarhini, A.; Masa’Deh, R.; Al-Busaidi, K.A.; Mohammed, A.B.; Maqableh, M.; Sharma, S. Factors influencing students’ adoption of e-learning: A structural equation modeling approach. J. Int. Educ. Bus. 2017 , 10 , 164–182. [ Google Scholar ] [ CrossRef ]
  • Ali, M.; Miller, L. ERP system implementation in large enterprises—A systematic literature review. J. Enterp. Inf. Manag. 2017 , 30 , 666–692. [ Google Scholar ] [ CrossRef ]
  • Croom, S.; Brandon-Jones, A. Impact of e-procurement: Experiences from implementation in the UK public sector. J. Purch. Supply Manag. 2007 , 13 , 294–303. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Gunasekaran, A.; Ngai, E.W. Adoption of e-procurement in Hong Kong: An empirical research. Int. J. Prod. Econ. 2008 , 113 , 159–175. [ Google Scholar ] [ CrossRef ]
  • Sawik, B. Selected Multiple Criteria Supply Chain Optimization Problems ; Lawrence, K.D., Pai, D.R., Eds.; Emerald Publishing Limited: Bingley, UK, 2020; pp. 31–58. [ Google Scholar ] [ CrossRef ]
  • De Boer, L.; Harink, J.; Heijboer, G. A conceptual model for assessing the impact of electronic procurement. Eur. J. Purch. Supply Manag. 2002 , 8 , 25–33. [ Google Scholar ] [ CrossRef ]
  • Davila, A.; Gupta, M.; Palmer, R. Moving Procurement Systems to the Internet: The Adoption and Use of E-Procurement Technology Models. Eur. Manag. J. 2003 , 21 , 11–23. [ Google Scholar ] [ CrossRef ]
  • Ibem, E.O.; Aduwo, E.B.; Afolabi, A.O.; Oluwunmi, A.O.; Tunji-Olayeni, P.F.; Ayo-Vaughan, E.A.; Uwakonye, U.O. Electronic (e-) Procurement Adoption and Users’ Experience in the Nigerian Construction Sector. Int. J. Constr. Educ. Res. 2020 , 17 , 258–276. [ Google Scholar ] [ CrossRef ]
  • Gupta, M.; Narain, R. A survey on adoption of e-procurement in Indian organisations. Int. J. Indian Cult. Bus. Manag. 2012 , 5 , 76–109. [ Google Scholar ] [ CrossRef ]
  • Wu Zsidisin, A.; Ross, D. Antecedents and Outcomes of E-Procurement Adoption: An Integrative Model. IEEE Trans. Eng. Manag. 2007 , 54 , 576–587. [ Google Scholar ]
  • Ahmad, H.; Hassan, S.H.A.; Ismail, S. Transparency level of the electronic procurement system in Malaysia. J. Financial Rep. Account. 2021 . ahead of print . [ Google Scholar ] [ CrossRef ]
  • Gunasekaran, A.; McGaughey Ronald, E.; Ngai Eric, W.T.; Rai Bharatendra, K. E-Procurement adoption in the Southcoast SMEs. Int. J. Prod. Econ. 2009 , 122 , 161–175. [ Google Scholar ] [ CrossRef ]
  • Presutti, W.D. Supply management and e-procurement: Creating value added in the supply chain. Ind. Mark. Manag. 2003 , 32 , 219–226. [ Google Scholar ] [ CrossRef ]
  • Angeles, R.; Nath, R. Business-to-business e-procurement: Success factors and challenges to implementation. Supply Chain. Manag. Int. J. 2007 , 12 , 104–115. [ Google Scholar ] [ CrossRef ]
  • Min, H.; Galle, W.P. E-purchasing: Profiles of adopters and nonadopters. Ind. Mark. Manag. 2003 , 32 , 227–233. [ Google Scholar ] [ CrossRef ]
  • Wang, Y.; Chang, C.; Heng, M. The levels of information technology adoption, business network, and strategic position model for evaluating supply chain integration. J. Electron. Commer. Res. 2004 , 5 , 85–98. [ Google Scholar ]
  • Bakker, E.; Zheng, J.; Knight, L.; Harland, C. Putting e-commerce adoption in a supply chain context. Int. J. Oper. Prod. Manag. 2008 , 28 , 313–330. [ Google Scholar ] [ CrossRef ]
  • Raghavendran, P.S.; Xavier, M.J.; Israel, D. Green Purchasing Practices: A study of E-Procurement in B2B Buying in Indian Small and Medium Enterprises. J. Supply Chain. Oper. Manag. 2012 , 10 , 13–23. Available online: http://www.procurementobservatoryraj.in/Phase-I/pdf/Green_Purchasing_Practices_A_study_of_e-procurement.pdf (accessed on 12 December 2021).
  • Zaidi, S.A.H.; Mirza, F.M.; Hou, F.; Ashraf, R.U. Addressing the sustainable development through sustainable procurement: What factors resist the implementation of sustainable procurement in Pakistan? Socio-Economic Plan. Sci. 2019 , 68 , 100671. [ Google Scholar ] [ CrossRef ]
  • Grandia, J.; Groeneveld, S.; Kuipers, B.; Steijn, B. Sustainable procurement in practice: Explaining the degree of sustainable procurement from an organisational perspective. In Public Procurement’s Place in the World ; Palgrave Macmillan: London, UK, 2014; pp. 37–62. [ Google Scholar ]
  • Ghosh, M. Determinants of green procurement implementation and its impact on firm performance. J. Manuf. Technol. Manag. 2019 , 30 , 462–482. [ Google Scholar ] [ CrossRef ]
  • Touboulic, A.; Walker, H. Theories in sustainable supply chain management: A structured literature review. Int. J. Phys. Distrib. Logist. Manag. 2015 , 45 , 16–42. [ Google Scholar ] [ CrossRef ]
  • Chomchaiya, S.; Esichaikul, V. Consolidated performance measurement framework for government e-procurement focusing on internal stakeholders. Inf. Technol. People 2016 , 29 , 354–380. [ Google Scholar ] [ CrossRef ]
  • Yevu, S.K.; Ann, T.W.; Adinyira, E.; Darko, A.; Antwi-Afari, M.F. Optimizing the application of strategies promoting electronic procurement systems towards sustainable construction in the building lifecycle: A neuro-fuzzy model approach. J. Clean. Prod. 2022 , 336 , 130343. [ Google Scholar ] [ CrossRef ]
  • Warken, I.; Henn, V.; da Rosa, F. Gestão da sustentabilidade: Um estudo sobre o nível de sustentabilidade socioambiental de uma Instituição Federal de Ensino Superior. Rev. Gestão Finanças Contab. 2014 , 4 , 147. [ Google Scholar ] [ CrossRef ]
  • Couto, H.L.G.D.; Coelho, C. Fatores críticos no comportamento do gestor público responsável por compras sustentáveis: Diferenças entre consumo individual e organizacional. Rev. Adm. Pública-RAP 2015 , 49 , 519–543. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Ramos, P.; Santos, C. Licitações públicas sustentáveis: Um estudo no Instituto Federal de Educação, Ciência e Tecnologia do Rio Grande do Sul. In Encontro Internacional Sobre Gestão Ambiental e Meio Ambiente (ENGEMA), 19 ; 2017; pp. 1–16. ISSN 2359–1048. Available online: http://engemausp.submissao.com.br/19/anais/arquivos/259.pdf (accessed on 13 December 2021).
  • Couto, H.L.G.D.; Ribeiro, F.L. Objetivos e desafios da política de compras públicas sustentáveis no Brasil: A opinião dos especialistas. Rev. Adm. Pública 2016 , 50 , 331–343. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Walker, H.; Brammer, S. The relationship between sustainable procurement and e-procurement in the public sector. Int. J. Prod. Econ. 2012 , 140 , 256–268. [ Google Scholar ] [ CrossRef ]
  • Sorooshian, S.; Ting, K.C. Reasons for implementing ISO 14001 in Malaysia. Environ. Qual. Manag. 2018 , 27 , 125–133. [ Google Scholar ] [ CrossRef ]
  • Chidambaram, H.; Evans, K.E. Big data: Is the energy industry starting to see real applications? Supply Chain. Manag. Rev. 2015 , 19 , 62–64. [ Google Scholar ]
  • Ruehle, K. Procurement: The forgotten element of digital transformation? Manuf. Bus. Technol. 2018 . Available online: https://www.mbtmag.com/home/article/13227984/procurement-the-forgotten-element-of-digital-transformation?utm_content=69052551&utm_medium=social&utm_source=twitter (accessed on 13 December 2021).
  • Khan, M.T.; Idrees, M.D.; Rauf, M.; Sami, A.; Ansari, A.; Jamil, A. Green Supply Chain Management Practices’ Impact on Operational Performance with the Mediation of Technological Innovation. Sustainability 2022 , 14 , 3362. [ Google Scholar ] [ CrossRef ]
  • AlNuaimi, B.K.; Khan, M. Public-sector green procurement in the United Arab Emirates: Innovation capability and commitment to change. J. Clean. Prod. 2019 , 233 , 482–489. [ Google Scholar ] [ CrossRef ]
  • Nawi, M.N.; Deraman, R.; Bamgbade, J.A.; Zulhumadi, F.; Riazi, S.R. E-Procurement in Malaysian Construction Industry: Benefits and Challenges in Implementation. Int. J. Supply Chain. Manag. 2017 , 6 , 209–213. [ Google Scholar ]
  • Rosli, S.A.; Songip, A.R. Effectiveness of E-Procurement in Malaysia. Int. J. Acad. Res. Bus. Soc. Sci. 2017 , 7 , 870–875. [ Google Scholar ]
  • Aman, A.; Kasimin, H. E-procurement implementation: A case of Malaysia government. Transform. Gov. People, Process Policy 2011 , 5 , 330–344. [ Google Scholar ] [ CrossRef ]
  • Ahimbisibwe, A.; Wilson, T.; Ronald, T. Adoption of E-procurement In Uganda: Migration from the Manual Procurement Systems to the Internet. J. Supply Chain. Manag. 2016 , 3 , 1–14. Available online: http://www.researchjournali.com/pdf/1932.pdf (accessed on 15 June 2019).
  • Ramkumar, M.; Jenamani, M. Sustainability in Supply Chain Through E-Procurement—An Assessment Framework Based on DANP and Liberatore Score. IEEE Syst. J. 2015 , 9 , 1554–1564. [ Google Scholar ] [ CrossRef ]
  • Kaliannan, M.; Awang, H.; Raman, M. Electronic procurement: A case study of Malaysia’s e-Perolehan (e-procurement) initiative. Int. J. Electron. Gov. 2009 , 2 , 103–117. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Osman, I.H.; Anouze, A.L.; Irani, Z.; Lee, H.; Medeni, T.D.; Weerakkody, V. A cognitive analytics management framework for the transformation of electronic government services from users’ perspective to create sustainable shared values. Eur. J. Oper. Res. 2019 , 278 , 514–532. [ Google Scholar ] [ CrossRef ]
  • Shuib, L.; Yadegaridehkordi, E.; Ainin, S. Malaysian urban poor adoption of e-government applications and their satisfaction. Cogent Soc. Sci. 2019 , 5 , 1565293. [ Google Scholar ] [ CrossRef ]
  • Soong, K.-K.; Ahmed, E.M.; Tan, K.S. Factors influencing Malaysian small and medium enterprises adoption of electronic government procurement. J. Public Procure. 2020 , 20 , 38–61. [ Google Scholar ] [ CrossRef ]
  • Kassim, E.S.; Hussin, H. A success model for the Malaysian government e-procurement system: The buyer perspective. Int. J. Electron. Gov. Res. 2013 , 9 , 1–18. [ Google Scholar ] [ CrossRef ]
  • Meehan, J.; Bryde, D.J. A field-level examination of the adoption of sustainable procurement in the social housing sector. Int. J. Oper. Prod. Manag. 2015 , 35 , 982–1004. [ Google Scholar ] [ CrossRef ]
  • Busu, C.; Busu, M. Research on the Factors of Competition in the Green Procurement Processes: A Case Study for the Conditions of Romania Using PLS-SEM Methodology. Mathematics 2020 , 9 , 16. [ Google Scholar ] [ CrossRef ]
  • Bohari, A.A.M.; Skitmore, M.; Xia, B.; Teo, M.; Khalil, N. Key stakeholder values in encouraging green orientation of construction procurement. J. Clean. Prod. 2020 , 270 , 122246. [ Google Scholar ] [ CrossRef ]
  • Wimalasena, N.N.; Gunatilake, S. The readiness of construction contractors and consultants to adopt e-tendering: The case of Sri Lanka. Constr. Innov. 2018 , 18 , 350–370. [ Google Scholar ] [ CrossRef ]
  • Choi, Y.; Lee, H.; Irani, Z. Big data-driven fuzzy cognitive map for prioritizing IT service procurement in the public sector. Ann. Oper. Res. 2018 , 270 , 75–104. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Manikam, S.; Sahibudin, S.; Selamat, H. Big data analytics initiatives using business intelligence maturity model approach in the public sector. In Advanced Science Letters ; American Scientific Publishers: Santa Clarita, CA, USA, 2017; Volume 23, pp. 4097–4100. ISSN 1936-6612. Available online: https://www.ingentaconnect.com/contentone/asp/asl/2017/00000023/00000005/art00061 (accessed on 19 June 2019).
  • Chersan, I.C.; Dumitru, V.F.; Gorgan, C.; Gorgan, V. Green public procurement in the academic literature. Amfiteatru Econ. 2020 , 22 , 82–101. [ Google Scholar ] [ CrossRef ]
  • Aragão, C.G.; Jabbour, C.J.C. Green training for sustainable procurement? Insights from the Brazilian public sector. Ind. Commer. Train. 2017 , 49 , 48–54. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Ramkumar, M.; Schoenherr, T.; Wagner, S.M.; Jenamani, M. Q-TAM: A quality technology acceptance model for predicting organizational buyers’ continuance intentions for e-procurement services. Int. J. Prod. Econ. 2019 , 216 , 333–348. [ Google Scholar ] [ CrossRef ]
  • Davis, F.; Bagozzi, R.; Warshaw. Wikipedia. Wikipedia.org. 1989. Available online: https://en.wikipedia.org/wiki/Technology_acceptance_model (accessed on 19 June 2019).
  • Daoud, L.; Ibrahim, M. The Factors Affecting on E-procurement Usage: The Moderating Role of Power. J. Physics: Conf. Ser. 2018 , 1019 , 012076. [ Google Scholar ] [ CrossRef ]
  • Iqbal, M.; Zahidie, A. Diffusion of innovations: A guiding framework for public health. Scand. J. Public Health 2021 , 5 , 14034948211014104. [ Google Scholar ] [ CrossRef ] [ PubMed ]
  • Singh, P.K.; Ismail, F.B.; Wei, C.S.; Imran, M.; Ahmed, S.A. A Framework of E-Procurement Technology for Sustainable Procurement in ISO 14001 Certified Firms in Malaysia. Adv. Sci. Technol. Eng. Syst. J. 2020 , 5 , 424–431. [ Google Scholar ] [ CrossRef ]
  • Etse, D.; McMurray, A.; Muenjohn, N. The Effect of Regulation on Sustainable Procurement: Organisational Leadership and Culture as Mediators. J. Bus. Ethic 2021 , 5 , 1–21. [ Google Scholar ] [ CrossRef ]
  • Hanák, T.; Marović, I.; Jajac, N. Challenges of Electronic Reverse Auctions in Construction Industry—A Review. Economies 2020 , 8 , 13. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • LaMorte, W.W. Diffusion of innovation theory. Boston University School of Public Health. 2019. Available online: https://sphweb.bumc.bu.edu/otlt/mph-modules/sb/behavioralchangetheories/behavioralchangetheories4.html (accessed on 15 July 2020).
  • Ndei, F.M.; Mutuku, M. Electronic Procurement and Performance of Non-Governmental Organizations in Kenya. Empirical Evidence from Pathfinder International, Kenya. J. Bus. Manag. Sci. 2021 , 9 , 71–80. [ Google Scholar ]
  • Blome, C.; Hollos, D.; Paulraj, A. Green procurement and green supplier development: Antecedents and effects on supplier performance. Int. J. Prod. Res. 2014 , 52 , 32–49. Available online: https://www.tandfonline.com/doi/abs/10.1080/00207543.2013.825748 (accessed on 15 July 2020).
  • Harelimana, J.B. The impact of e-procurement on the performance of public institutions in Rwanda. Glob. J. Manag. Bus. Res. 2018 , 12. [ Google Scholar ]
  • Siricha, P.S.; Theuri, F.S. The Effects of Electronic Procurement on Organizational Performance in Kenya Ports Authority. Imp. J. Interdiscip. Res. 2016 , 19 , 5. [ Google Scholar ]
  • Mois, G.; Beer, J.M. Chapter 3—Robotics to support aging in place. In Living with Robots ; Pak, R., de Visser, E.J., Ericka, R., Eds.; Academic Press: New York, NY, USA, 2020; pp. 49–74. [ Google Scholar ]
  • Gupta, A.K.; Gupta, N. Effect of corporate environmental sustainability on dimensions of firm performance—Towards sustainable development: Evidence from India. J. Clean. Prod. 2020 , 253 , 119948. [ Google Scholar ] [ CrossRef ]
  • Quesada, G.; González, M.E.; Mueller, J.; Mueller, R. Impact of e-procurement on procurement practices and performance. Benchmarking Int. J. 2010 , 17 , 516–538. [ Google Scholar ] [ CrossRef ]
  • Chang, H.H.; Tsai, Y.C.; Hsu, C.H. E-procurement and supply chain performance. Supply Chain. Manag. Int. J. 2013 , 18 , 34–51. [ Google Scholar ] [ CrossRef ]
  • Allal-Chérif, O. Improving Sustainable Procurement: The Role of Information Systems. Int. J. E-Serv. Mob. Appl. 2012 , 4 , 42–58. [ Google Scholar ] [ CrossRef ]
  • Teo, T.; Huang, F.; Hoi, C.K.W. Explicating the influences that explain intention to use technology among English teachers in China. Interact. Learn. Environ. 2017 , 26 , 460–475. [ Google Scholar ] [ CrossRef ]
  • Yusoff, W.S.; Islam, A.; Abas, Z.; Yusuf, D.H. Electronic Government Procurement Adoption Behavior amongst Malaysian SMEs. Int. Bus. Res. 2010 , 4 , 100. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Abu Bakar, N.; Peszynski, K.; Azizan, N.; Sundram, V.P.K. Abridgment of Traditional Procurement and E-Procurement: Definitions, Tools and Benefits. J. Emerg. Econ. Islam. Res. 2016 , 4 , 74–91. [ Google Scholar ] [ CrossRef ]
  • AlNuaimi, B.K.; Khan, M.; Ajmal, M.M. The role of big data analytics capabilities in greening e-procurement: A higher order PLS-SEM analysis. Technol. Forecast. Soc. Chang. 2021 , 169 , 120808. [ Google Scholar ] [ CrossRef ]
  • Luijken, T.; Martini, M. The Role of Technology in Reducing Corruption in Public Procurement. Anti-Corruption Helpdesk. Transparency International. Disponible à L’adresse. 2014. Available online: http://www.transparency.org/whatwedo/answer/the_role_of_technology_in_reducing_corruption_in_public_procurement (accessed on 9 February 2019).
  • Panayiotou, N.A.; Gayialis, S.P.; Tatsiopoulos, I.P. An e-procurement system for governmental purchasing. Int. J. Prod. Econ. 2004 , 90 , 79–102. [ Google Scholar ] [ CrossRef ]
  • Ho, L.W.; Dickinson, N.M.; Chan, G.Y. Green procurement in the Asian public sector and the Hong Kong private sector. In Natural Resources Forum ; Blackwell Publishing Ltd.: Oxford, UK, 2010; Volume 34, pp. 24–38. [ Google Scholar ]
  • Vaidyanathan, G.; Devaraj, S. The role of quality in e-procurement performance: An empirical analysis. J. Oper. Manag. 2008 , 26 , 407–425. [ Google Scholar ] [ CrossRef ]
  • Konradt, U.; Lückel, L.; Ellwart, T. The role of usability in business-to-business e-commerce systems: Predictors and its impact on user’s strain and commercial transactions. Adv. Hum.-Comput. Interact. 2012 , 2012 , 20. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Devaraj, S.; Vaidyanathan, G.; Mishra, A.N. Effect of purchase volume flexibility and purchase mix flexibility on e-procurement performance: An analysis of two perspectives. J. Oper. Manag. 2012 , 30 , 509–520. [ Google Scholar ] [ CrossRef ]
  • Marshall, D.; McCarthy, L.; Claudy, M.C.; McGrath, P. Piggy in the Middle: How Direct Customer Power Affects First-Tier Suppliers’ Adoption of Socially Responsible Procurement Practices and Performance. J. Bus. Ethic 2016 , 154 , 1081–1102. [ Google Scholar ] [ CrossRef ]
  • Leal Filho, W.; Shiel, C.; Paço, A.; Mifsud, M.; Ávila, L.V.; Brandli, L.L.; Molthan-Hill, P.; Pace, P.; Azeiteiro, U.M.; Vargas, V.R.; et al. Sustainable development goals and sustainability teaching at universities: Falling behind or getting ahead of the pack? J. Clean. Prod. 2019 , 232 , 285–294. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Sarkis, J.; Zhu, Q. Environmental sustainability and production: Taking the road less travelled. Int. J. Prod. Res. 2017 , 56 , 743–759. [ Google Scholar ] [ CrossRef ]
  • Galeazzo, A.; Ortiz-de-Mandojana, N.; Delgado-Ceballos, J. Green procurement and financial performance in the tourism industry: The moderating role of tourists’ green purchasing behavior. Curr. Issues Tour. 2021 , 24 , 700–716. [ Google Scholar ] [ CrossRef ]
  • Ahsan, K.; Rahman, S. Green public procurement implementation challenges in Australian public healthcare sector. J. Clean. Prod. 2017 , 152 , 181–197. [ Google Scholar ] [ CrossRef ]
  • Nijaki, L.K.; Worrel, G. Procurement for sustainable local economic development. Int. J. Public Sect. Manag. 2012 , 25 , 133–153. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Hollos, D.; Blome, C.; Foerstl, K. Does sustainable supplier co-operation affect performance? Examining implications for the triple bottom line. Int. J. Prod. Res. 2012 , 50 , 2968–2986. [ Google Scholar ] [ CrossRef ]
  • Rajesh, R.; Rajendran, C. Relating Environmental, Social, and Governance scores and sustainability performances of firms: An empirical analysis. Bus. Strat. Environ. 2019 , 29 , 1247–1267. [ Google Scholar ] [ CrossRef ]
  • Testa, F.; Grappio, P.; Gusmerotti, N.M.; Iraldo, F.; Frey, M. Examining green public procurement using content analysis: Existing difficulties for procurers and useful recommendations. Environ. Dev. Sustain. 2015 , 18 , 197–219. [ Google Scholar ] [ CrossRef ]
  • Tokbolat, S.; Karaca, F.; Durdyev, S.; Calay, R.K. Construction professionals’ perspectives on drivers and barriers of sustainable construction. Environ. Dev. Sustain. 2020 , 22 , 4361–4378. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Capello, M.; Oro, L.G.G. Gasto público eficiente: Propuestas para un mejoramiento en los sistemas de compras y contrataciones gubernamentales. Actual. Econ. 2015 , 25 , 5–20. [ Google Scholar ]
  • Huq, F.A.; Stevenson, M. Implementing Socially Sustainable Practices in Challenging Institutional Contexts: Building Theory from Seven Developing Country Supplier Cases. J. Bus. Ethic 2018 , 161 , 415–442. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Matos, S.V.; Schleper, M.C.; Gold, S.; Hall, J.K. The hidden side of sustainable operations and supply chain management: Unanticipated outcomes, trade-offs and tensions. Int. J. Oper. Prod. Manag. 2020 , 40 , 1749–1770. [ Google Scholar ] [ CrossRef ]
  • McMurray, A.; Islam, M.; Siwar, C.; Fien, J. Sustainable procurement in Malaysian organizations: Practices, barriers and opportunities. J. Purch. Supply Manag. 2014 , 20 , 195–207. [ Google Scholar ] [ CrossRef ]
  • Mani, V.; Gunasekaran, A.; Delgado, C. Enhancing supply chain performance through supplier social sustainability: An emerging economy perspective. Int. J. Prod. Econ. 2018 , 195 , 259–272. [ Google Scholar ] [ CrossRef ]
  • Murcia, M.J.; Panwar, R.; Tarzijan, J. Socially Responsible Firms Outsource Less. Bus. Soc. 2020 , 60 , 1507–1545. [ Google Scholar ] [ CrossRef ]
  • Crespin-Mazet, F.; Dontenwill, E. Sustainable procurement: Building legitimacy in the supply network. J. Purch. Supply Manag. 2012 , 18 , 207–217. [ Google Scholar ] [ CrossRef ]
  • Waris, M.; Panigrahi, S.; Mengal, A.; Soomro, M.I.; Mirjat, N.H.; Ullah, M.; Azlan, Z.S.; Khan, A. An Application of Analytic Hierarchy Process (AHP) for Sustainable Procurement of Construction Equipment: Multicriteria-Based Decision Framework for Malaysia. Math. Probl. Eng. 2019 , 2019 , 6391431. [ Google Scholar ] [ CrossRef ]
  • Gounden, K. Factors Influencing Sustainable Procurement within the Private and Public Sector in South Africa. Ph.D. Thesis, University of Pretoria, Pretoria, South Africa, 2016. [ Google Scholar ]
  • Ciliberti, F.; Pontrandolfo, P.; Scozzi, B. Investigating corporate social responsibility in supply chains: A SME perspective. J. Clean. Prod. 2008 , 16 , 1579–1588. [ Google Scholar ] [ CrossRef ]
  • Carter, C.R.; Jennings, M.M. The role of purchasing in corporate social responsibility: A structural equation analysis. J. Bus. Logist. 2004 , 25 , 145–186. [ Google Scholar ] [ CrossRef ]
  • Ntayi, J.M.; Mugume, E. A taxonomy of strategic sourcing for defense forces in sub-Saharan Africa. World J. Entrep. Manag. Sustain. Dev. 2014 , 10 , 13–32. [ Google Scholar ]
  • Zailani, S.; Jeyaraman, K.; Vengadasan, G.; Premkumar, R. Sustainable supply chain management (SSCM) in Malaysia: A survey. Int. J. Prod. Econ. 2012 , 140 , 330–340. [ Google Scholar ] [ CrossRef ]
  • Kahlenborn, W.; Mansor, N.; Adham, K. Government green procurement (GGP) Short-term action plan 2013–2014. Sustain. Consum. Prod. (SCP) Policy Support Malays. 2013 , 6 , 1–25. [ Google Scholar ]
  • Sheik, I.; Singh, P.K. Industry 4.0 managerial roles and challenges. Int. J. Innov. Eng. Res. Technol. 2020 , 5 , 378–381. [ Google Scholar ]
  • Obradović, T.; Vlačić, B.; Dabić, M. Open innovation in the manufacturing industry: A review and research agenda. Technovation 2021 , 102 , 102221. [ Google Scholar ] [ CrossRef ]
  • Rahmanzadeh, S.; Pishvaee, M.S.; Govindan, K. Emergence of open supply chain management: The role of open innovation in the future smart industry using digital twin network. Ann. Oper. Res. 2022 , 4 , 1–29. [ Google Scholar ] [ CrossRef ]
  • Nee, G.Y.; Wahid, N.A. The effect of ISO 14001 environmental management system implementation on SMEs performance: An empirical study in Malaysia. J. Sustain. Dev. 2010 , 3 , 215. [ Google Scholar ]
  • Mansi, M. Sustainable procurement disclosure practices in central public sector enterprises: Evidence from India. J. Purch. Supply Manag. 2015 , 21 , 125–137. [ Google Scholar ] [ CrossRef ]
  • Aibinu, A.A.; Al-Lawati, A.M. Using PLS-SEM technique to model construction organizations’ willingness to participate in e-bidding. Autom. Constr. 2010 , 19 , 714–724. [ Google Scholar ] [ CrossRef ]
  • Vaidyanathan, G.; Devaraj, S.; D’Arcy, J. Does Security Impact E-procurement Performance? Testing a Model of Direct and Moderated Effects. Decis. Sci. 2012 , 43 , 437–458. [ Google Scholar ] [ CrossRef ]
  • Iles, J. How is E-Procurement Related to the Success of US Cities’ Sustainable Purchasing Policies? ASU School of Sustainability, Arizona State University: Tempe, AZ, USA, 2017. [ Google Scholar ]
  • Yevu, S.K.; Yu, A.T.; Nani, G.; Darko, A.; Tetteh, M.O. Electronic Procurement Systems Adoption in Construction Procurement: A Global Survey on the Barriers and Strategies from the Developed and Developing Economies. J. Constr. Eng. Manag. 2022 , 148 , 04021186. [ Google Scholar ] [ CrossRef ]
  • Altounjy, R.; Alaeddin, O.; Hussain, H.I.; Kot, S. Moving from Bricks to Clicks: Merchants’ Acceptance of the Mobile Payment in Malaysia. Int. J. eBusiness eGovernment Stud. 2020 , 12 , 136–150. [ Google Scholar ] [ CrossRef ]
  • Tayaran, H.; Ghazanfari, M. A Framework for Online Reverse Auction Based on Market Maker Learning with a Risk-Averse Buyer. Math. Probl. Eng. 2020 , 2020 , 5604246. [ Google Scholar ] [ CrossRef ]
  • Candela, A.; Ulises, F. E-Procurement and Performance of Manufacturing Firms in Buenos Aires, Argentina. J. Procure. Supply Chain. 2022 , 6 , 1–10. [ Google Scholar ] [ CrossRef ]
  • Manthou, V.; Bialas, C.; Stefanou, C.J. Benefits and barriers of e-sourcing and e-purchasing in the healthcare sector: A case study. In Automated Enterprise Systems for Maximizing Business Performance ; IGI Global: Thessaloniki, Greece, 2016; pp. 71–87. [ Google Scholar ]
  • Kimutai, B.; Ismael, N.S. Role of strategic e-sourcing practices on supply chain performance in state corporations in Kenya: A case of Kenya Electricity Generating Company Ltd. Int. Acad. J. Procure. Supply Chain. Manag. 2016 , 2 , 113–133. [ Google Scholar ]
  • Schoenherr, T. Becoming Mainstream: Electronic Sourcing Suites. In The Evolution of Electronic Procurement ; Palgrave Pivot: Cham, Switzerland, 2019; pp. 87–100. [ Google Scholar ]
  • Mwangi, P.N. Application of E-Sourcing And E-Informing in Procurement Practices on Procurement Performance in Independent Electoral And Boundaries Commission In Kenya. Int. J. Bus. Manag. Financ. 2020 , 3 . [ Google Scholar ]
  • Kasemsap, K. Mastering electronic procurement, green public procurement, and public procurement for innovation. In Digital Governance and E-Government Principles Applied to Public Procurement ; IGI Global: Bangkok, Thailand, 2017; pp. 29–55. [ Google Scholar ]
  • Afande, F.O. Adoption of E-Procurement Strategy and Procurement Performance in State Corporations in Kenya (A Case of KRA). Ind. Eng. Lett. 2015 , 5 , 1–24. [ Google Scholar ]
  • Gunaratne, H.; Pappel, I. Enhancement of the e-Invoicing Systems by Increasing the Efficiency of Workflows via Disruptive Technologies. In International Conference on Electronic Governance and Open Society: Challenges in Eurasia ; Springer: Cham, Switzerland, 2020; pp. 60–74. [ Google Scholar ]
  • Chepkwony, J.K.; Lagat, C. E-Ordering and E-Informing on Supply Chain Performance in Retail Marketing Outlets in Kenya. J. Mark. Consum. Res. 2016 , 1 , 3. [ Google Scholar ]
  • Kiroski, K.; Gusev, M.; Ristov, S. IaaS Cloud Model for e-Ordering and e-Invoicing. In FedCSIS (Position Papers) ; Cyril and Methodius University: Skopje, Macedonia, 2013; pp. 105–110. [ Google Scholar ]
  • Mutangili, S.K. Influence of E-Procurement Practices on Supply Chain Performance: A Case Study of Kenya Airways. J. Procure. Supply Chain. 2019 , 3 , 1–16. [ Google Scholar ]
  • Hair, J.F.; Risher, J.J.; Sarstedt, M.; Ringle, C.M. When to use and how to report the results of PLS-SEM. Eur. Bus. Rev. 2019 , 31 , 2–24. [ Google Scholar ] [ CrossRef ]
  • Henseler, J.; Ringle, C.M.; Sarstedt, M. A new criterion for assessing discriminant validity in variance-based structural equation modeling. J. Acad. Mark. Sci. 2015 , 43 , 115–135. [ Google Scholar ] [ CrossRef ] [ Green Version ]
  • Sarkar, B.; Ullah, M.; Kim, N. Environmental and economic assessment of closed-loop supply chain with remanufacturing and returnable transport items. Comput. Ind. Eng. 2017 , 111 , 148–163. [ Google Scholar ] [ CrossRef ]
  • Ahmad, T.; Aljafari, R.; Venkatesh, V. The Government of Jamaica’s electronic procurement system: Experiences and lessons learned. Internet Res. 2019 , 29 , 1571–1588. [ Google Scholar ] [ CrossRef ]
  • Al-Dalou, R.; Abu-shanab, E. E-participation levels and technologies. In Proceedings of the 6th International Conference on Information Technology, (ICIT 2013), Amman, Jordan, 8 May 2013; pp. 8–10. [ Google Scholar ]
  • Bataineh, L.; Abu-Shanab, E. How perceptions of E-participation levels influence the intention to use E-government websites. Transform. Gov. People Process Policy 2016 , 10 , 315–334. [ Google Scholar ] [ CrossRef ]
  • Masudin, I.; Aprilia, G.; Nugraha, A.; Restuputri, D. Impact of E-Procurement Adoption on Company Performance: Evidence from Indonesian Manufacturing Industry. Logistics 2021 , 5 , 16. [ Google Scholar ] [ CrossRef ]
  • Boateng, E.; Simons, B. Barriers to the Adoption of Electronic Tendering in Construction Procurement in Ghana. Ph.D. Thesis, Sunyani Technical University, Sunyani, Ghana, 2021. [ Google Scholar ]
  • Raventós, P.; Zolezzi, S. Electronic tendering of pharmaceuticals and medical devices in Chile. J. Bus. Res. 2015 , 68 , 2569–2578. [ Google Scholar ] [ CrossRef ]
  • O’Connell, L. Electronic Tendering: Recognising a More Effective Use of Information Communications Technology in the Irish Construction Industry. Master’s Thesis, Dublin Institute of Technology, Dublin, Ireland. [ CrossRef ]
  • Langat, B.K. Electronic Sourcing and Procurement Cost of Commercial State Corporations in Kenya. Ph.D. Thesis, University of Nairobi, Nairobi, Kenya, 2019. [ Google Scholar ]
  • Sunmola, F.T.; Shehu, Y.U. A Case Study on Performance Features of Electronic Tendering Systems. Procedia Manuf. 2020 , 51 , 1586–1591. [ Google Scholar ] [ CrossRef ]
  • Dey, K.; Bhattacharya, J. Reverse Auction Administration in Indian Public Sector Coal Mining, its Effect on the Engineering and Unsustainable Outcomes. J. Inst. Eng. (India) Ser. D 2021 , 102 , 103–111. [ Google Scholar ] [ CrossRef ]
  • Kandpal, D.; Dhingra, T. Migrating to reverse Auction mechanisms in wind energy sector: Status and challenges. Energy Policy 2021 , 156 , 112352. [ Google Scholar ] [ CrossRef ]
  • Cabral, Ó.; Ferreira, L.; Dias, G.P. Adoption of reverse auctions in public e-procurement: The case of Portugal. In Proceedings of the 2016 11th Iberian Conference on Information Systems and Technologies (CISTI), Gran Canaria, Spain, 15–18 June 2016; pp. 1–5. [ Google Scholar ]
  • Hanák, T. Electronic reverse auctions in public sector construction procurement: Case study of Czech buyers and suppliers. TEM J. 2018 , 7 , 41–52. [ Google Scholar ]
  • Pawar, P.V.; Behl, A.; Aital, P. Systematic literature review on electronic reverse auction: Issues and research discussion. Int. J. Procure. Manag. 2017 , 10 , 290–310. [ Google Scholar ] [ CrossRef ]
  • Li, X.; Zhao, L.; Lee, S.H. Measuring user experiences with e-sourcing platforms: The development of the e-sourcing experience index. J. Fash. Mark. Manag. Int. J. 2020 , 25 , 430–447. [ Google Scholar ] [ CrossRef ]
  • Ruparathna, R.; Hewage, K. Sustainable procurement in the Canadian construction industry: Current practices, drivers and opportunities. J. Clean. Prod. 2015 , 109 , 305–314. [ Google Scholar ] [ CrossRef ]

Click here to enlarge figure

Author (Year)Scope of EPT and SPPTheory/Country/Industry
Walker and Brammer (2012)Relationship, sustainable supply chainInformation system/Multiple
Ramkumar and Jenamani (2015)Adoption, sustainable supply chain, frameworkTAM/Multiple
Yu et al. (2020)Relationship, integrated frameworkRBV, TOE/Construction
Yevu et al. (2022)EPT implementation for sustainability TAM, RBV
Ruparathna and Hewage (2015)SustainabilityCanada
Chen et al. (2021)Adoption, sustainable strategiesTAM/Multiple
Brandon-Jones and Kauppi (2018)Adoption, sustainabilityTAM/Netherlands
Ramkumar et al. (2019)Usage, implementation TAM, DCB, RBV/Multiple
AlNuaimi et al. (2021)Implementation, environmental performanceROT/UAE
Toktaş-Palut et al. (2014)Benefits, usageTurkey
Belisari et al. (2020)Adoption, implementation, sustainabilityItaly
Khan et al. (2022)Technology innovation, operational performance, green supply chain managementPakistan
Masudin et al. (2021)Adoption, performanceIndonesia
VariablesClassification of VariablesFrequencyTotalPercentage (%)
GenderMale10815270
Female4430
AgeBetween 20 and 29 years4215227
Between 30 and 39 years8655
Between 40 and 49 years2114
Between 50 and 59 years34
EducationSPM01520
SPTM2818
Diploma7650
Degree4229
Masters53
Ph.D.00
VariablesNMean ValueStandard DeviationMinimumMaximum
E-Tendering1524.3060.72535
E-Reverse auctioning1523.3071.01425
E-Informing1524.4430.72935
E-Sourcing1524.0960.87745
E-Ordering1523.8740.86435
Green Procurement Practices1524.3240.58025
ConstructsAverage Variance
Extracted (AVE > 0.5)
Composite Reliability
(CR > 0.7)
Cronbach’s AlphaEvidence
E-Informing (E-INF)0.6980.9020.856Valid
E-Ordering (E-ORD)0.7050.9050.863Valid
E-Reverse auctioning (E-RA)0.8010.9410.918Valid
E-Sourcing
(E-SOU)
0.7800.9340.906Valid
E-Tendering (E-TEN)0.7830.9350.908Valid
Green Procurement
Practices
(GPP)
0.5050.9170.903Valid
ConstructsE-InformingE-OrderingE-Reverse AuctioningE-SourcingE-TenderingGreen Procurement Practices
E-Informing0.835
E-Ordering0.1540.839
E-Reverse auctioning0.2280.1440.895
E-Sourcing0.3980.1910.2390.883
E-Tendering0.5240.1110.1930.4900.885
Green Procurement Practices0.4170.2020.2500.9290.5090.709
ConstructsE-InformingE-OrderingE-Reverse AuctioningE-SourcingE-TenderingGreen Procurement Practices
E-Informing
E-Ordering0.201
E-Reverse Auctioning0.2680.163
E-Sourcing0.4510.1970.257
E-Tendering0.5880.1330.2120.535
Green Procurement Practices0.4620.2670.4010.6910.540
Latent ConstructR Square (R )Result
Green Procurement Practices
(GPP)
0.868High
ConstructSSO/SSEQ = (1 − SSE/SSO)
Green Procurement Practices
(GPP)
1672/
1009.934
0.396
PathOriginal Sample (O)-BetaStandard Deviation (STDEV)T Statisticsp ValuesDecisions
E-INF → GPP0.0290.0482.6040.044Supported
E-ORD → GPP0.0210.0346.6070.000Supported
E-RA → GPP0.0190.0300.6190.536Unsupported
E-SOU → GPP0.8810.0302.9310.000Supported
E-TEN → GPP0.0560.0451.2470.213Unsupported
MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

Singh, P.K.; Chan, S.W. The Impact of Electronic Procurement Adoption on Green Procurement towards Sustainable Supply Chain Performance-Evidence from Malaysian ISO Organizations. J. Open Innov. Technol. Mark. Complex. 2022 , 8 , 61. https://doi.org/10.3390/joitmc8020061

Singh PK, Chan SW. The Impact of Electronic Procurement Adoption on Green Procurement towards Sustainable Supply Chain Performance-Evidence from Malaysian ISO Organizations. Journal of Open Innovation: Technology, Market, and Complexity . 2022; 8(2):61. https://doi.org/10.3390/joitmc8020061

Singh, Pratik Kumar, and Shiau Wei Chan. 2022. "The Impact of Electronic Procurement Adoption on Green Procurement towards Sustainable Supply Chain Performance-Evidence from Malaysian ISO Organizations" Journal of Open Innovation: Technology, Market, and Complexity 8, no. 2: 61. https://doi.org/10.3390/joitmc8020061

Article Metrics

Article access statistics, further information, mdpi initiatives, follow mdpi.

MDPI

Subscribe to receive issue release notifications and newsletters from MDPI journals

  • DOI: 10.1504/IJPM.2007.015353
  • Corpus ID: 167330942

Electronic Procurement: A Structured Literature Review and Directions for Future Research

  • T. Schoenherr , V. Tummala
  • Published 11 October 2007
  • Business, Computer Science
  • ERN: Technology (Topic)

98 Citations

E-procurement in the hospitality industry: an exploratory study, what is the value of an it e-procurement system, e-procurement in services: the lagging application of innovation, systematic literature reviews in purchasing and supply management research: a tertiary study, e-procurement adoption: a case study about the role of two italian advisory services, understanding digital transformation of procurement through e-procurement systems implementation, analysing b2b electronic procurement benefits: information systems perspective, exploring the uptake and application of electronic procurement to central and local government, a study on usage of it and its implications on e-procurement in indian organisations, institutional responses to electronic procurement in the public sector, 166 references, e-procurement maturity in industry, the e-procurement experience in italian universities, supply chain management: a structured literature review and implications for future research, key issues in e-procurement: procurement implementation and operation in the public sector, redesigning contracted service procurement for internet-based electronic commerce: a case study, research paper series graduate school of business stanford university moving procurement systems to the internet: the adoption and use of e-procurement technology models, critical factors that influence e-procurement implementation and success in the public sector, the (real) management implications of e-procurement, icts adoption and knowledge management: the case of an e-procurement system.

  • Highly Influential

The world bank e-Procurement for the selection of consultants: challenges and lessons learned

Related papers.

Showing 1 through 3 of 0 Related Papers

E-procurement System Adoption in Local Governments: the Role of Procurement Complexity and Organizational Structure

Chen Y, Bretschneider S, Stritch JM, Darnall N, Hsueh, H. 2021. E-procurement system adoption in local governments: the role of procurement complexity and organizational structure. Public Management Review. DOI: 10.1080/14719037.2021.1874497

17 Pages Posted: 6 Jan 2022

Arizona State University (ASU) - School of Public Affairs

Stuart bretschneider, justin stritch.

Arizona State University (ASU) - School of Public Affairs; The Danish National Centre for Social Research

Nicole Darnall

American University - Kogod School of Business; Sustainable Purchasing Research Initiative, Arizona State University; Arizona State University; American University

Date Written: February 2, 2021

The article examines how local governments’ procurement complexity and structure interact to influence e-procurement adoption. Drawing on the survey data of over 400 cities, we find that a centralized structure enhances the likelihood that local governments adopt an e-procurement system to cope with the increasing procurement complexity; while governments with a coordinated structure are less likely to adopt e-procurement as they can rely on the intra-organizational collaboration and information-sharing embedded in the structure to accommodate complex procurements. The findings shed insights on how local governments with different structures can best deal with complex managerial activities and facilitate e-procurement adoption.

Keywords: E-procurement adoption, organizational structure, centralization, local government, public procurement

JEL Classification: H57, D78, H76, C54, Q58, Q56, H83, D73

Suggested Citation: Suggested Citation

Arizona State University (ASU) - School of Public Affairs ( email )

Farmer Building 440G PO Box 872011 Tempe, AZ United States

411 N. Central Avenue Phoenix, AZ 85004 United States

The Danish National Centre for Social Research ( email )

Herluf Trolles Gade 11 Copenhagen, 1052 Denmark

Nicole Darnall (Contact Author)

American university - kogod school of business ( email ).

4400 Massachusetts Avenue NW Washington, DC 20816-8044 United States

Sustainable Purchasing Research Initiative, Arizona State University ( email )

PO Box 875502 Tempe, AZ 85287-5502 United States

HOME PAGE: http://https://sustainability-innovation.asu.edu/spri/

Arizona State University ( email )

HOME PAGE: http://https://search.asu.edu/profile/1811617

American University ( email )

4400 Massachusetts Ave, NW Washington, DC 20016 United States

411 N. Central Ave., Suite 455 Phoenix, AZ 85004-0687 United States

HOME PAGE: http://https://sites.google.com/site/lilyhsueh/

Do you have a job opening that you would like to promote on SSRN?

Paper statistics, related ejournals, political economy: structure & scope of government ejournal.

Subscribe to this fee journal for more curated articles on this topic

Political Economy: National, State & Local Government; Intergovernmental Relations eJournal

Political economy: government expenditures & related policies ejournal, socially responsible investment ejournal, political institutions: bureaucracies & public administration ejournal, political institutions: federalism & sub-national politics ejournal, environment for innovation ejournal, information systems & economics ejournal, public procurement, government contracts & outsourcing ejournal.

Subscribe to this free journal for more curated articles on this topic

Energy & Environmental Science eJournal

Decision-making in computational design & technology ejournal, political economy - development: fiscal & monetary policy ejournal.

U.S. flag

An official website of the United States government

The .gov means it’s official. Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

The site is secure. The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

  • Publications
  • Account settings

Preview improvements coming to the PMC website in October 2024. Learn More or Try it out now .

  • Advanced Search
  • Journal List
  • Springer Nature - PMC COVID-19 Collection

Logo of phenaturepg

A Systematic Review of Implementation Challenges in Public E-Procurement

Idah mohungoo.

Department of Information System, University of Cape Town, Private Bag X3, Rondebosch, 7701 South Africa

Irwin Brown

Salah kabanda.

Challenges faced in public e-procurement implementation are not well understood despite past studies focusing on the phenomenon. This paper, which is based on a systematic literature review of academic papers, seeks to synthesize and examine the key challenges impeding public e-procurement implementation. These challenges are categorized using the Technology-Organization-Environment (TOE) framework as follows (1) Technological challenges: e-procurement acceptance and usage, disruptive innovation characteristic of e-procurement, use of digital signatures, security and privacy of technology and technical aspects of e-procurement (2) Organizational challenges: stakeholders’ behavior, leaders’ behavior, shortcomings in leadership, lack of training and skilled personnel, resistance to change, organizational power and politics and the creation of public value underlying e-procurement (3) Environmental/Contextual challenges: regulatory framework for public procurement, Small-and-Medium-Size Enterprise issues, and context of the country. Key e-procurement implementation challenges are grounded in human and contextual issues. So we recommend more case studies on public e-procurement implementation in the future.

Introduction

Public e-procurement, commonly referred to as e-GP, is an inter-organizational system (IOS) that is intended to facilitate Government-to-Business (G2B) and Government-Government (G2G) electronic communication, information exchange, and transaction support [ 53 ]. E-procurement, which is part of public procurement reform, is a powerful tool to reduce corruption in public procurement as it reinforces transparency, accountability, and integrity in procurement functions [ 38 ]. Several developed countries such as Singapore, Australia, the UK, the USA, and Japan have successfully implemented public e-procurement systems and are reaping its benefits [ 37 ]. However, in many countries, the implementation of public e-procurement systems is perceived as daunting [ 9 , 16 , 18 , 34 , 37 , 52 ] and it is not used to its full potential.

Sub-Saharan African countries, which on average have low scores on the corruption perception index [ 51 ], have expressed enthusiasm and interest in adopting e-procurement to help to curb corruption and make significant economic impacts. However, these countries face several e-procurement implementation challenges, which if not addressed, can firstly, delay the implementation process which has cost implications and; secondly, motivated leaders can lose interest and enthusiasm in driving implementation if there are too many challenges to be addressed.

Given that public e-procurement implementation is still problematic implies that implementation challenges of public e-procurement have not been well understood to date. To this end, this paper aims to provide an in-depth examination and synthesis from an information system (IS) perspective of the challenges to public e-procurement implementation using a sequentially-phased qualitative systematic literature review approach as informed by Okoli [ 39 ]. The research question, “ What are the implementation challenges to public e - procurement? ” will thus be addressed.

Conceptual Background

Public e-procurement implementation is a complex endeavour characterized by multiple Government-to-Business organizations (G2B), and private sector companies. These stakeholders have interests and power that can influence the outcome of the Inter-Organizational Information System (IOIS) implementation [ 9 ]. Under the assumption of information system (IS) as a socio-technical endeavour, the interplay between the implementation of e-procurement and the public-private sector context is deemed to be challenging [ 55 ]. These implementation challenges should be understood in order to formulate effective strategies to contain them. Furthermore, unlike e-procurement in the private sector context, public e-procurement is expected to reflect public values such as accountability and transparency.

Public e-procurement can be understood as a hybrid of e-government, information systems, and public administration. Thus, it is highly likely that e-procurement challenges are documented in papers published in these different domains. So far, there is a lack of an integrated approach to the synthesis of e-procurement implementation challenges; and when there is an attempt to do so, it is carried out in a rather fragmented manner. Researchers have seldom stepped outside a specific discipline in e-procurement literature reviews. For example, Patrucco [ 43 ] undertook a systematic literature review on public e-procurement, focusing only on papers published in the Journal of Public Procurement. While this provides an initial view of e-procurement, such studies fail to provide a holistic view of the phenomenon given that e-procurement spans works in e-government, information systems, and public administration. To address this shortcoming, this paper offers a systematic approach to synthesizing e-procurement implementation challenges by including publications from the three domains mentioned above. The Technology-Organizational-Environment (TOE) framework [ 50 ] which is popular in studies of adoption and implementation of innovations, will be used to present the e-procurement implementation challenges. The TOE framework [ 50 ] allows the identification of the main factors influencing the adoption and implementation of innovations within different organizational contexts and therefore serves a good starting point for structuring the study – specifically the identification of technological, organizational and environmental challenges constraining e-procurement implementation.

Research Methodology

Research approach.

A sequentially-phased, qualitative systematic literature review approach informed by Okoli [ 39 ] is used in this paper. It is characterized by a sequence of activities starting with article search, followed by practical screening, a full reading of papers, synthesis, and analysis.

Data Collection

A Desktop search of relevant articles was systematically done using a timeline from 2001 to date. Based on Google Scholar, the earliest case studies on public e-procurement were published around the year 2001. Data collection was focused consistently around the aim of the research, and the keywords used were specific to the goal of the study, as shown in Fig.  1 , which depicts the different systematic passes used in the search and selection of relevant articles:

  • Basket of eight leading Information Systems (IS) journals: European Journal of Information Systems, Information Systems Journal, Information Systems Research, Journal of Association of Information Systems, Journal of Management Information System, MIS Quarterly, Journal of Strategic Information Systems and Journal of Information Technology.
  • Given that in several developing countries including those in Africa, e-procurement implementation is an important issue, the top 3 IT4D journals, i.e., Electronic Journal of Information System in Developing Countries (EJISDC), IT for Development and IT for International Development were also searched.
  • IS conference proceedings focusing on emerging e-procurement implementation challenges that are found in research-in-progress in the respective afore-mentioned streams. The AIS top 4 conferences (ICIS, ECIS, PACIS, and AMCIS) were searched as well as IFIP conferences.
  • Leading top-rated e-government journals consulted were: International Journal of E-Government Research (IJEGR), Journal of E-Government, Journal of e-Governance, Government Information Quarterly
  • In public administration stream: the Journal of Public Administration and Public Administration Review were searched.
  • The second pass was a backward search after the initial search yielded few papers. The purpose of the second pass was to look for additional relevant conference papers and journal articles in other domains.
  • The third pass involved searching for adoption-focused e-procurement papers that were previously eliminated in the first-pass. This pass increased the likelihood of gathering additional secondary data on implementation challenges of e-procurement because some adoption-focused papers were case studies of post-acquisition of e-procurement software and thus were likely to contain facts on e-procurement implementation challenges.

An external file that holds a picture, illustration, etc.
Object name is 497534_1_En_5_Fig1_HTML.jpg

Search and selection of articles (after the fashion of Gunther et al. 2017)

The data corpus, which now stood at 165 articles after the previous process, was subjected to a ‘Practical Screening’ phase to remove irrelevant articles [ 39 ] using a process of inclusion and exclusion criteria. This process required the principal researcher reading the article’s Title, Abstract, Introduction, and Conclusion, as explained in Table  1 . Following the screening, 45 papers were retained for full reading and 34 for the final analysis as shown in Table  2 . After this analysis process, relevant arguments that explain the implementation challenges faced in e-procurement implementation were extracted from the 34 papers. The key arguments were then subjected to thematic analysis in NVIVO. Emergent themes generated from common patterns in the data corpus are shown in Table  3 . These themes were then structured as per the TOE framework [ 50 ] for easier conceptualization.

Table 1.

Screening of papers – exclusion criteria

Exclusion criteriaRationale underlying exclusionExclusion
B2B/private sectorThe study focused only on public e-procurement[ ]
E-procurement adoption focused researchAll e-procurement adoption papers focusing on pre-acquisition of the software were excluded because, in this study, implementation is understood as a stage of post-acquisition of the software[ ]
E-procurement research papers with theory-focused or with focus on a specific process of e-procurement

(1) Articles that focus on a specific theory were discarded, for example, the economic aspects of e-procurement, use of knowledge management approach to understand e-procurement implementation and issues, evidence of good governance in public e-procurement

(2) Articles focusing in detail on a specific process or aspect of e-procurement such as reverse auctions were also excluded

[ , ],

[ , ]

[ ]

a Examples of papers that are excluded as part of the screening process

Table 2.

Breakdown of selected articles by publication outlet

JournalsRead Retained
AIS basket of eight leading IS journals (MISQ, ISR, JMIS, JAIS, ISJ, JSIS, EJIS JIT); ICT4D Top 3 (EJISDC, IT4D and ITID)42
Information Technology & People11
Electronic Commerce Research10
Scandinavian Journal of Information Systems22
Journal of Information Technology Teaching Cases11
IFIP Advances in IS Research, Education and Practice Proceedings11
Information Systems Frontiers11
Management and Labour Studies10
Electronic Journal of Electronic Government21
Journal of Public Procurement54
Public Administration Quarterly11
Emerging Markets Finance and Trade11
International Review of Administrative Sciences11
International Journal of Public Administration22
Journal of Purchasing and Supply and Management11
International Journal of Production and Operations Management11
Journal of Enterprise Information Management10
Strategic Change11
AIS Conference Proceedings (ICIS, ECIS, PACIS, AMCIS)54
Other Conference proceedings and papers86
Vikalpa: Journal for Decision Makers11
Advances in e-Government, Digital Divide & Regional Development32
4534

a Full length paper read

Table 3.

Empirical findings of public e-procurement implementation challenges

Implementation challengesAuthors
TechnologicalAcceptance and usage issues[ , , , , , , , , , ]
Disruptive nature of e-procurement[ , ]
Digital/Electronic signature[ , ]
IT security issues[ , , , ]
Complicated system[ ]
Multi-platform[ , ]
Lack of system integration[ , , , , , , , ]
Shortcomings in online product catalogue[ , ]
Challenges for software specifications[ ]
Inadequate IT & networking infrastructure[ , ]
OrganizationalStakeholders’ issues[ , , ]
Leaders’ behavior[ ]
Shortcomings in leadership[ , , ]
Change management problems[ , ]
Lack of a project champion[ ]
Lack of training and skilled personnel[ , , , , , ]
Resistance to change[ , , , , , ]
Slow-to-change culture[ , ]
Departmentalism[ ]
Major reforms through ICT[ , ]
Value-driven outcome[ , , ]
EnvironmentalRegulatory frameworks[ , , ]
SME issues[ , , , , , , ]
Country context[ , , ]

Findings and Discussion

Technological challenges.

Key technological challenges that deserve due attention given that they are tied with human and contextual issues are acceptance and usage issues, disruptive innovation, digital signature, and IT security issues. The remaining ones pertain to the technical aspects of e-procurement, and they are grouped as ‘other technological challenges’ in the discussion below.

Acceptance and Usage Issues.

The findings indicate that acceptance and usage is an important challenge for e-procurement. The reasons were vast, ranging from techno-centric issues to broader dimensions such as dissatisfaction with e-procurement systems that do not meet the needs of users with the consequence of emergence of multiple workarounds [ 37 ]; Lack of user-friendliness of e-procurement [ 5 , 34 ]; Complicated systems [ 5 , 20 ]; Inability to enlist sufficient suppliers in a timely manner to encourage IS use [ 53 ]; The use of technology which is in tension with cultural histories of IT usage, bureaucratic processes and business practices [ 55 ].

Disruptive Innovation.

E-procurement is viewed as a disruptive innovation [ 4 , 35 ] that can drive a radical transformation, thereby uprooting some institutionalized work practices. It may conflict with the slow-to-change culture of G2G stakeholders of e-procurement [ 36 ].

Digital Signature/Electronic Signature.

Costa, Arantes, and Tavarez [ 17 ] found that digital signature, which is mandatory for e-procurement, is complex to use and is costly, whereas Ojha and Pandey [ 40 ] found that the digital signature is a means of excessive security on e-procurement causing exclusion of some suppliers. Beyond these techno-centric aspects, the use of digital or electronic signatures can directly clash with the stakeholders’ values, beliefs, and customs associated with manuscript signatures [ 49 ].

IT Security issues.

Mc cue Roman [ 37 ] found that IT security and authenticity was the major challenge in e-procurement as stakeholders had concerns and demanded more re-assurance with regards to the robustness of the security aspect of the e-procurement platform in terms of IT security measures implemented for access control, backup and recovery [ 22 ].

Other Technological Challenges.

Other technological challenges include amongst others, system integration problems with legacy and suppliers’ systems, which is an important technical issue and is underpinned by the use of different enterprise software systems to handle each stage of the procurement cycle [ 2 , 34 ]; the presence of multi-platforms for tendering which confuse bidders [ 5 ]; excessively complicated systems and; different data formats [ 5 , 17 ].

Organizational Challenges

Organizational issues in e-procurement implementation are interlinked. Lack of a project champion and problems of change management are associated with shortcomings in leadership. Resistance to change is explained alongside other challenges, including departmentalism, major reform through ICT and organizational power and politics.

Stakeholders’ Issues.

Drawing from e-government studies, scholars advocated the importance of sustained engagement of stakeholders in e-government implementation to enhance IS acceptance [ 13 ]. The review findings indicate a lack of stakeholder engagement in e-procurement implementation [ 15 , 33 , 36 ]. Scholars advised implementers to convince stakeholders to get their buy-in to improve IS usage [ 15 , 34 , 52 ].

Leaders’ Behavior.

Williams-Elegbe [ 56 ] argues that public sector leaders often exhibit unethical behaviours which can hamper the implementation of e-procurement. Leaders’ behavior was associated with the failure of past e-government projects [ 25 , 28 ]. Some leaders played overt rationality whilst having buried agendas [ 18 ], and obfuscated the objectives behind e-government to achieve their interests [ 44 ].

Shortcomings in Leadership.

In some cases, public sector leaders are genuinely committed to achieving success in e-procurement implementation, but they may lack leadership skills [ 24 , 34 ] to address change management problems [ 1 , 24 ], and become good project champions which is a critical success factor in any e-government implementation [ 56 ].

Lack of Training and Skilled Personnel.

Inadequate staff training on e-procurement results in low e-procurement usage ([ 17 , 24 , 34 ]). Furthermore, lack of skilled ICT personnel on-site to deal with technical e-procurement issues, service-level agreements, and operationalization of the private-public partnership model of e-procurement implementation are serious impediments to e-procurement implementation ([ 30 , 40 , 46 ]).

Resistance to Change.

Resistance to change is a significant e-procurement implementation challenge with multiple underlying causes. Small and Medium Enterprises (SMEs) resist to e-procurement because they require equitable access to government business [ 55 ]. Besides, the reforms driven through e-government projects often conflict with reforms prescribed in public policies which follow the New Public Management (NPM): Somasundaram [ 46 ] found that centralization ideas underlying e-procurement, conflicted with the decentralization ideology [ 46 ] which challenged the norms of Danish local authorities; while Barca and Cordella [ 6 ] found that e-procurement faces departmentalism challenges which are perceived as a strong cultural and organizational barrier [ 6 ]. Resistance to change is also grounded in organizational power and politics [ 2 ] that shadowed the benefits of e-procurement: purchase managers were unwilling to use e-procurement despite agreeing with the economic arguments of cost-saving, and reduction of direct procurement costs related to the new e-procurement platform [ 29 ].

Value-Driven Outcome.

Unlike the private sector, implementation of public e-procurement is expected to reflect public values of transparency, integrity, and accountability [ 6 , 37 , 53 ]. If the government expects e-procurement to enforce accountability and transparency for good governance, implementation will be called a success when stakeholders make sense of these public values and embrace them, which is indeed challenging to achieve.

Environmental Challenges

E-procurement implementation yielded different outcomes in different countries, with varying success in Italy, Australia and, Scotland [ 55 ] but failure in Turkey whereby expected results of increased competition and lower procurement prices were not achieved [ 27 ]. Regulatory frameworks, SME issues, and the country context are among the key environmental challenges that have been found as relevant in this review.

Regulatory Framework.

Public procurement regulatory frameworks may present significant challenges in e-procurement implementation [ 21 , 29 , 57 ], the most pertinent ones being the mandated use of e-procurement; and the laws governing the use of digital signatures which limits the participation of SMEs in government bids.

SME Issues.

The difficulties that SMEs face with respect to e-procurement and public procurement process are amongst others: exclusion of SMEs [ 17 , 54 ]; SME lack of investment in ICT infrastructure [ 3 , 27 ]; lack of financial capabilities and contract guarantees as needed by government procurement; insufficient competence in terms of standards and technical qualifications set by the market [ 41 ]. The business context of a country, therefore, poses a challenge to the success of e-procurement implementation especially if SMEs make a substantial contribution to the GDP. In Turkey, exclusion of SMEs negatively affected competition in the market and caused a rise in prices which ran contrary to the proclaimed expectations from public e-procurement implementation [ 27 ].

Country Context.

The federal-state dynamic, especially in big countries has been found to be a key challenge for e-procurement [ 46 ], whereby the best practices underlying the success of e-procurement in a specific state were not replicated to other states as it could compromise the degree of autonomy of the other states. Considering cultural challenges, some developing countries continue with corrupt practices despite e-procurement because corruption has become entrenched in the culture. Overt and covert corruption has become the norm in these countries [ 56 ]. It is challenging to achieve the expected objectives of e-procurement, i.e., transparency, accountability and curbing corruption.

Other Country-Related Challenges.

E-procurement which is a G2B e-government project and is based on e-commerce technology, faces similar country-context challenges of e-government implementation in developing countries such as poor ICT infrastructure, language barriers, impact of local customs, norms and national culture, lack of financial instruments such as debit/credit card to facilitate e-commerce [ 11 , 32 ]. These contextual challenges are beyond the scope of this review but are directly relevant to e-procurement.

The key e-procurement implementation challenges are interlinked, as presented under the TOE typology [ 50 ] in Fig.  2 . The arrows indicate the relationship between the key challenges identified and discussed in this study.

An external file that holds a picture, illustration, etc.
Object name is 497534_1_En_5_Fig2_HTML.jpg

Inter-relationship of key e-procurement implementation challenges

This study aimed to synthesize and examine the implementation challenges to public e-procurement. A multi-disciplinary qualitative systematic literature review was done based on papers published in the e-government, information systems and public administration domains. The study identified (1) technological challenges of acceptance and usage, e-procurement as a disruptive innovation and technical issues with e-procurement; (2) organizational challenges of stakeholders’ issues, leadership, inadequate training, and skilled personnel, resistance to change and value-driven outcome and (3) key environmental factors of procurement regulatory framework, the country context and, the problems faced by SMEs. These findings enlighten practitioners and policy implementors with information on the possible hindrances to successful e-procurement implementation. Building upon this awareness, future studies can embark on explaining the causal mechanism of these challenges and how best to address them in a context-specific manner. This research work focused on e-procurement implementation challenges as a whole and excluded challenges pertaining to specific e-procurement processes such as e-tendering and e-reverse auction. The proposed framework in this paper can be used in future case studies to examine e-procurement implementation challenges under each focus area of the TOE [ 50 ] and their relationship.

Contributor Information

Marié Hattingh, Email: [email protected] .

Machdel Matthee, Email: [email protected] .

Hanlie Smuts, Email: [email protected] .

Ilias Pappas, Email: [email protected] .

Yogesh K. Dwivedi, Email: moc.liamg@ideviwdky .

Matti Mäntymäki, Email: [email protected] .

Idah Mohungoo, Email: ku.oc.liamtoh@oognuhomi .

Irwin Brown, Email: [email protected] .

Salah Kabanda, Email: [email protected] .

IEEE Account

  • Change Username/Password
  • Update Address

Purchase Details

  • Payment Options
  • Order History
  • View Purchased Documents

Profile Information

  • Communications Preferences
  • Profession and Education
  • Technical Interests
  • US & Canada: +1 800 678 4333
  • Worldwide: +1 732 981 0060
  • Contact & Support
  • About IEEE Xplore
  • Accessibility
  • Terms of Use
  • Nondiscrimination Policy
  • Privacy & Opting Out of Cookies

A not-for-profit organization, IEEE is the world's largest technical professional organization dedicated to advancing technology for the benefit of humanity. © Copyright 2024 IEEE - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.

Academia.edu no longer supports Internet Explorer.

To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to  upgrade your browser .

Enter the email address you signed up with and we'll email you a reset link.

  • We're Hiring!
  • Help Center

paper cover thumbnail

Effective e-procurement implementation in the public sector

Profile image of Dama Academic Scholarly & Scientific Research Society

2020, Project Management Scientific Journal | Published by: Dama Academic Scholarly & Scientific Research Society

Currently there is a trend towards increased focus on the importance of the purchasing function and costs of maintenance, repair, and operation (MRO) goods. This has led to companies investing in electronic procurement tools in order to reduce those costs and increase efficiency. However, studies have shown that only 20-27% of these investments are successful. To ensure the success of such investments, it is beneficial to consider critical success factors (CSFs) covering important aspects of the implementation. The aim of this master’s thesis is to validate and assess the relevance of a framework covering eleven CSFs for three distinctive project phases of an electronic procurement implementation. The main research question is “Are different CSFs more or less relevant for different types of end-users in an e-procurement implementation context?”, but is limited to some parts of the framework considering its comprehensiveness. The purpose of the framework is to aid managers in decision-making by presenting a framework with clear managerial implications. In addition, the framework is also intended to assist the ongoing implementation of an electronic ordering system at the case company, St Olav’s Hospital, to which both this master’s and our pre-diploma thesis were written in collaboration with. The framework in focus was developed by us in our pre-diploma thesis, but although looking promising, it needed further validation. This master’s thesis will continue the work by employing a case study survey research design and quantitatively analyzing the results of a survey deployed to 803 end-users at the case company, capturing the end-user perspective of the implementation. The findings of the thesis show that some of the investigated CSFs are indeed important to the sample of end-users, and that there are differences, especially regarding sex and age, in how important end-users consider the CSFs to be. For example, training is found to be more important for both females and for older respondents, while communication is found to be important for all end-users. Moreover, an exploratory factor analysis suggests that there is room for improving the framework, by finding that the perceptions towards electronic systems are important to consider. Furthermore, these findings imply that companies should not only consider the CSFs in the framework, but also the differences that may exist between end-users.

Related Papers

Journal of Strategic Information Systems

Grafton Whyte

e procurement research paper

Cyro Barretto

Proceedings of the International Conference on Accounting Studies (ICAS)

This study proposes a conceptual framework that intends to assess user satisfaction and the net benefits of implementing e-procurement system in government-owned hospitals. The study uses DeLone and McLean IS Success model as the underpinning theory to examine the relationship between three independent variables (information quality, system quality and service quality) and the user satisfaction and net benefits of using an e-procurement system in government-owned hospitals. Predictably, the framework of this study is expected to provide a meaningful explanation on the degree of user satisfaction in using an e-procurement system in hospitals. Also, the study tries to provide a theoretical background to examine the benefits that are being derived from the system, especially regarding cost saving, timeliness, accountability and transparency. Finally, the paper suggested that empirical studies should be carried out to test the proposed model of this paper.

Management Information Systems Quarterly

Azleen Ilias

WAN SAMSUDIN

This study examines the direct relationship between perceived ease of use, perceived usefulness, top management support, vendor assurance, vendor responsivenss and user‟s satisfaction. A total of 450 questionnaires were disributed to participants who had agreed to participate in this study. However, only 312 questionnaire were usable for further analyses. Hypotheses for direct effect were tested using multiple regression analyses. Results showed that all variable tested in this study, namely perceived ease of use, perceived usefulness, top management support, vendor assurance, vendor responsiveness were significantly positively associated with user's satisfaction. Implications of the findings, potential limitations, and directions for future research are discussed

Benson James Lyimo

The main objective of this study was to assess the user perception of electronic procurement in public organization a case of TANESCO in Iringa region, this study has been conducted for three main specific objectives. The first one was to assess the influence of management performance in using electronic procurement at TANESCO, second specific objective was to examine the need of computerized system and its contribution on the perceived ease of use of electronic procurement at TANESCO, and the third objective was to assess employee competence influence on the use of e procurement at TANESCO in Iringa Region, Tanzania The study adopted both research methods, qualitative and quantitative approaches. They were both used so as to help the researcher to complement the weakness of each, therefore provide an extended room for triangulation of both instruments for data collection and approaches. The sample comprised of 50 respondents. Data was collected through questionnaires, both open ended questionnaires and open ended questionnaires. The quantitative data was analyzed with the help of Microsoft Excel 2010 and Statistical Package for Social Science (SPSS) software program version 22 and were summarized in tables of frequencies, percentages, correlations, regression and charts. Study findings unveiled that management performance and availability of computerized system lead to the minimization and reduction of errors in local purchasing orders, increase speed of work, simplify procurement processes hence allow storage of data and documentation for a long time and most of all increase accuracy of work in TANESCO. Also Employee competence influence E-procurement. Thus the study recommends that employees who are authorized to operate E-procurement system should be closely supervised so as to ensure that they do not get opportunity to misuse the system and perform duties for their own benefit. Also TANESCO should review their policies governing regularly and make sure that E-procurement system placed cope with the current technology.

Fazlyn Petersen

Abstract Purpose - This study aims to develop and validate an instrument for measuring end user computing satisfaction in computerized accounting system (CAS) environment particularly in private sectors organization. Thus, the study aims to contribute to the existing body of knowledge in the area of information technology. Design/methodology/approach - Theoretically, this study measures and validates the instrument of Doll and Torkzadeh EUCS (with some additional dimensions) among private companies. The study relied on survey design. Findings - This paper revised and validated instruments for measuring end-user computing satisfaction (EUCS) in computerized accounting system (CAS) in private sectors organization. Descriptive analysis and factor analysis were employed in this study to measure and validate the factors contributing to end-user computing satisfaction. Originality/value - The relationship between the management of an organisation and the information system are measured by the satisfaction of the users. This phenomenon encourages a more focused measurement to explain the overall satisfaction of the computerised accounting system (CAS). Keywords: End-User Computing Satisfaction, Computerized Accounting System, Accounting Information System, End-User, Private Organization, Factor Analysis Paper type: Research Paper

Loading Preview

Sorry, preview is currently unavailable. You can download the paper by clicking the button above.

RELATED PAPERS

hafizah mansor

International Journal of Operations & Production Management

Alistair Brandon-jones

Information & Management

Sustainable Competitive Advantage

wiwiek Adawiyah

Journal of Government and Politics

Achmad Nurmandi

IJACSA Editorial

L. Sanzogni

International Journal of Engineering Research and

Brenno Barbosa

International Journal of Service Industry Management

E-service …

Costas Vassilakis

csi-sigegov.org

Magiswary Dorasamy

T. C. E. Cheng

Social Science Research Network

Dr. Prabir Panda

Information Resources Management Journal

Emad Kamhawi

Geoffrey Sandy

Journal of Computer Science IJCSIS

Thanh D. Nguyen , Tuan Nguyen

Vedantha Kundalram

International Journal of Management & Information Systems (IJMIS)

Sanaz Tehrani

Problems and Perspectives in Management

YANUAR NUGROHO

Ioannis Moisoglou

Lectito Journals , Maria Leonilde R. Varela

International Journal of Managing Information Technology

Devendra Punia

Dr. Prabir Panda , Ganesh Sahu

Journal of Purchasing and Supply Management

Alessandro Brun

RELATED TOPICS

  •   We're Hiring!
  •   Help Center
  • Find new research papers in:
  • Health Sciences
  • Earth Sciences
  • Cognitive Science
  • Mathematics
  • Computer Science
  • Academia ©2024

IMAGES

  1. What is e-Procurement?

    e procurement research paper

  2. 📌 Project Procurement Paper Example

    e procurement research paper

  3. How to Write a Research Paper in English

    e procurement research paper

  4. A Research Model of e-Procurement CSFs

    e procurement research paper

  5. E-procurement in three steps

    e procurement research paper

  6. Procurement Process Flow & How to Optimize (The 2024 Guide)

    e procurement research paper

VIDEO

  1. PART -1 PROCUREMENT || MODULE (PROJECT MGMT) || BSNL LDCE JTO(T) TO SDE(T)ll LICE SDE -AGM #BSNL

  2. How analytics and unified data platforms boost supply chain effectiveness

  3. “Germany’s Confusing Defense Procurement”

  4. Management Principles and Practices Part 5

  5. #003

  6. The Freight Cycle requires Five Fundamentals for Manufacturers to Weather

COMMENTS

  1. (PDF) Electronic Procurement: A Structured Literature Review and

    structured literature review is warranted. As such, this paper reviews 157 refereed. journal articles dealing with electronic procurement, and examines them along eight key. dimensions. Based on ...

  2. The Impact of E-Procurement Practices on Supply Chain ...

    The purpose of the present research is the study of the association amidst the practices of electronic procurement and its impact on supply chain performance. We analyzed four prime practices of e-procurement that known as electronic design, electronic sourcing, electronic negotiation, and electronic evaluation.

  3. The Role of E-procurement in Supply Chains

    The added value of e-procurement can improve both client services and the companies' competitiveness in the market. The advantages of an online procurement system are as follows [ 1, 34, 35 ]: Shortening the paper requisition process, purchase, bills and the failures that occurred due to manual document processing;

  4. Literature Review and Research Issues in e-Procurement

    This paper looks into prior research on interorganizational information systems (IOIS), electronic data interchange (EDI), channel management and procurement to develop a research framework and identify research issues in e-Procurement defining important terms such as volume, width and depth of e-Procurement and classifying the ownership and ...

  5. (PDF) IMPACT OF E-PROCUREMENT ON PROCUREMENT PRACTICES ...

    E-Design, E-Sourcing, E-Negotiation, E-Evaluatio n, Supply Chain Management. INTRODUCTION Procurement is the acquisition of supplies and services for a co mpany.

  6. A Systematic Review of Implementation Challenges in Public E-Procurement

    This research work focused on e-procurement implementation challenges as a whole and excluded challenges pertaining to specific e-procurement processes such as e-tendering and e-reverse auction. The proposed framework in this paper can be used in future case studies to examine e-procurement implementation challenges under each focus area of the ...

  7. E-procurement Significantly Affects Supply Chain Performance

    E-procurement is a web-based process involving of four main aspects: e-sourcing, e-evaluation, e-negotiation, and e-design [ 40, 47, 48] Based on the systemic nature of e-procurement, supplier relationship proposed as an independent variable which reflects the influence of e-procurement on supply chain performance.

  8. E-procurement and E-supply Chain: Features and Development of E

    The model of e-collaboration, through implementation of e-procurement system, allows to speed up the flow of supply, making the process of order release. 4.1. Setting used: stock and flow The model developed simulates the behavior of a real manufacturing system that operates in a make-to- order environment.

  9. The Impact of Electronic Procurement Adoption on Green Procurement

    This research paper is therefore intended to address the gap by investigating the degree of sustainability after the adoption of E-procurement practices, identify the factors that are significant for E-procurement as an instrument of sustainable supply chain performance, and the relationship between E-procurement technology (EPT) and green ...

  10. E-procurement system adoption in local governments: the role of

    ABSTRACT. The article examines how local governments' procurement complexity and structure interact to influence e-procurement adoption. Drawing on the survey data of over 400 cities, we find that a centralized structure enhances the likelihood that local governments adopt an e-procurement system to cope with the increasing procurement complexity; while governments with a coordinated ...

  11. A SYSTEMATIC REVIEW ON E-PROCUREMENT BY SMEs

    E-procurement is a web-based technology that can make the procurement process more efficient. ( Rotchanakitumnuai, 2013) making the work of SMEs easier and quicker without any flaws in the. supply ...

  12. Electronic Procurement: A Structured Literature Review and Directions

    This paper reviews 157 refereed journal articles dealing with EP, and examines them along eight key dimensions, and suggests directions for future research are suggested. The practice of Electronic Procurement (EP) has gained popularity over the last ten years, and so has the research on this emerging area. While first reports in the 1990s focused on general descriptions and best practices ...

  13. E-procurement System Adoption in Local Governments: the Role of ...

    Abstract. The article examines how local governments' procurement complexity and structure interact to influence e-procurement adoption. Drawing on the survey data of over 400 cities, we find that a centralized structure enhances the likelihood that local governments adopt an e-procurement system to cope with the increasing procurement complexity; while governments with a coordinated ...

  14. Impact of e‐procurement on procurement practices and performance

    Design/methodology/approach - This paper posits a model of the relationships between e‐procurement technology (EPT) usage, PPR, and PP. This model was tested and validated using a sample of 368 procurement specialists in the USA.

  15. PDF A Systematic Review of Implementation Challenges in Public E-Procurement

    A multi-disciplinary qualitative systematic literature review was done based on papers published in the e-government, information systems and public administration domains. The study identi ed (1) technological challenges of acceptance. fi. and usage, e-procurement as a disruptive innovation and technical issues with.

  16. A Systematic Review of Implementation Challenges in Public E-Procurement

    E-procurement research papers with theory-focused or with focus on a specific process of e-procurement (1) Articles that focus on a specific theory were discarded, for example, the economic aspects of e-procurement, use of knowledge management approach to understand e-procurement implementation and issues, evidence of good governance in public ...

  17. A Systematic Review of Implementation Challenges in Public E-Procurement

    This paper, which is based on a systematic literature review of academic papers, seeks to. synthesize and examine the key challenges impeding public e-procurement. implementation. These challenges ...

  18. Public E-procurement: A Research Synthesis

    In recent years, the number of publications dedicated to public e-procurement system, which is an application within the e-government, has been increasing. As public e-procurement systems cover and affect not only the issues of information systems, but also the concern of administration, economics, and social domain, they capture the interests of numerous studies to pursue a wide range of ...

  19. PDF The Impact of E-Procurement on the Performance of Public Institutions

    Hence, e-procurement has improved the performance of the ministry since it reduced its expenses from 24.4 million in 2015 to 18.6 million in 2016. Lastly, from the Chi-square test, the researcher learnt that e-procurement in terms of electronic bidding, electronic supplier registration, electronic billing and electronic payment.

  20. E-procurement adoption in Nigeria: perceptions from the public sector

    findings contribute to a better understanding of the factors influencing the adoption of e-procurement in the Nigerian public sector. Keywords Nigeria, Publicsector, Technologyacceptancemodel (TAM),Publicprocurement, E-procurement Paper type Research paper 1. Introduction E-procurement solutions have improved the efficiency of purchasing ...

  21. Effective e-procurement implementation in the public sector

    E-procurement refers to the use of internet-based information and communication technologies to carry out stages of the procurement process, as depictured above, such as supplier selection, sourcing, ordering, expediting, and evaluation (Croom and Brandon-Jones, 2005). There are various forms of e-procurement concentrating on the different stages.

  22. (PDF) A Study of E-Procurement Practices in Selected ...

    Hence, the purpose of this research is to study the E-Procurement practices in selected industrial manufacturing organizations in Gujarat. Manufacturing sector has a greater propensity to adopt ...

  23. PDF E-procurement and The Performance of Small and Medium Enterprises in

    E-Payment This is the process whereby payments are made and processed electronically E-Procurement This refers to use of IT to improve procurement which is responsive to various changes within the environment E-Sourcing This a process through which a firm identifies suppliers necessary for a detailed type of purchasing